Case study that enabled energy conservation and reduction of electricity costs┃Successfully reduced contracted demand and transitioned from a negotiated contract to a real consumption contract【*Looking for agents】
Here is a case study of the introduction of "ESCO-ONE" at a pachinko parlor.
A few years ago, during peak times, demand exceeded 500 kW, leading to a notification from the power company to change to a negotiated contract (contract demand over 500 kW), resulting in increased electricity costs and difficulties.
By implementing this product, annual electricity costs were reduced by 2,200,000 yen, and the contract demand decreased from 547 kW to 482 kW, successfully transitioning from a negotiated contract to a real demand contract.
[Case Overview]
■Challenges
- Outside of peak periods, the usage situation was around a contract demand of 400 kW, so we were looking for a way to stabilize demand below 500 kW and escape from the negotiated contract.
■Results
- With the introduction of ESCO-ONE, demand has been consistently kept below 500 kW without causing environmental changes.
[Recruiting Agents]
ESCO-ONE is recruiting sales agents, regardless of whether they are corporations or individual entrepreneurs. Even without knowledge of energy-saving equipment, our company provides full support, so please feel free to contact us.
*For more details, please refer to the related links or feel free to contact us.